Overcoming Challenges: Advancing the MGCs Future Main Battle Tank
$ 14.99 · 4.7 (610) · In stock
On 10 July of this year, German Defence Minister Boris Pistorius and his French counterpart Sebastien Lecornu met in Berlin to discuss the advancement of the long-planned MGCS (Main Ground Combat System) project. The two ministers reinforced the willingness of their respective governments to push forward with the joint procurement of a new generation tank capable of integrating the technologies and characteristics needed on the battlefield of the future, drawing from the lessons of the ongoing Ukrainian war. The cooperation between the two countries on the MGCS tanks was part of a larger package of joint procurements agreed upon between Macron and Merkel's administrations in January 2019. It included a fighter jet (FCAS), an armed drone, artillery systems and a maritime reconnaissance aircraft
Going from around 900 Chieftains to 420 CR-1's to 386 CR-2's now only 147 CR-3's, guessing by the next tank will have maybe 20, if our government have their way. : r/TankPorn
A Ticket For Russians Inside The EU: The Golden Passports - Finabel
Overcoming challenges: advancing the MGCS future Main Battle Tank
Are drones a war game changer? The Ukrainian case
Italy may soon join the MGCS programme
Rheinmetall and Ukrainian Defence Industry to establish a joint venture
Overcoming Challenges: Advancing the MGCs Future Main Battle Tank - Finabel
The Main Battle Tank Project: A Bearer of Interoperability for a Coherent European Defence - Finabel
Stefan OPREA on LinkedIn: 56th Artillery Command Led Fires in Europe
Overcoming challenges: advancing the MGCS future Main Battle Tank